Construction process optimisation – review of methods, tools and applications

Václav Venkrbec, Mario Galić, Uroš Klanšek

Abstract

A review of current heuristic techniques and mathematical programming methods is presented in the paper. Modern optimisation modelling tools are presented, common construction optimisation problems are described, and an overview of their recent application is given. It is also stressed that there is ample room for further research on active BIM-based optimisation models, aimed at better management of construction processes. Accelerated development of decision-making models, which combine optimisation methods and information systems, can be clearly predicted for the near future.

Keywords
BIM, construction production, modelling, optimisation methods, process optimisation

HOW TO CITE THIS ARTICLE:

Venkrbec, V., Galić, M., Klanšek, U.: Construction process optimisation – review of methods, tools and applications, GRAĐEVINAR, 70 (2018) 7, pp. 593-606, doi: https://doi.org/10.14256/JCE.1719.2016

OR:

Venkrbec, V., Galić, M., Klanšek, U. (2018). Construction process optimisation – review of methods, tools and applications, GRAĐEVINAR, 70 (7), 593-606, doi: https://doi.org/10.14256/JCE.1719.2016

LICENCE:

Creative Commons License
This paper is licensed under a Creative Commons Attribution 4.0 International License.
Authors:
venkrbec WEB
Václav Venkrbec
Brno University of Technology
Civil Engineering
Institute for Technology, Mechanization and Management in Civil Engineering
Czech Republic
Mario Galic 2021 photo
Mario Galić
University J. J. Strossmayer in Osijek
Faculty of Civil Engineering
Fotografija U. Klansek WEB
Uroš Klanšek
University of Maribor
Faculty of Civil Engineering, Transportation Engineering and Architecture
Chair of Construction Management, Technology and Economics
Slovenia