Archive

UDK: 624.6.004.5:625.745.1
DOI: n/a

Published: Građevinar 56 (2004) 9
Paper type: Professional paper
Download article (Croatian): PDF
Download article (English): n/a

Periodic maintenance activities on Krk bridge

Dragutin Vujić

Abstract

Maintenance activities conducted on the Krk bridge since its opening to traffic are presented. These activities were performed in a continuous manner. The way in which new information, i.e. information gained after bridge construction, was used in the maintenance and repair of the bridge is presented. It is emphasized that the biggest problem encountered on the bridge was the corrosion due to chlorides, for which no data were available in the literature at the time the bridge was built. All methods and activities used in the repair and maintenance of this bridge are described.

Keywords
repair, chloride-generated corrosion, realization of repair activities, Krk bridge, periodic maintenance

HOW TO CITE THIS ARTICLE:

Vujić, D.: Periodic maintenance activities on Krk bridge, GRAĐEVINAR, 56 (2004) 9

OR:

Vujić, D. (2004). Periodic maintenance activities on Krk bridge, GRAĐEVINAR, 56 (9)
Authors:

Dragutin Vujić
Croatian Motorways, Ltd