Archive

Published: Građevinar 67 (2015) 4
Paper type: Original scientific paper
Download article (Croatian): PDF
Download article (English): PDF

Multicriteria assessment of unfinished construction projects

Marius Lazauskas, Vladislavas Kutut, Edmundas Kazimieras Zavadskas

Abstract

Possible ways for assessing completion of unfinished residential buildings to achieve appropriate construction project objectives are presented in the paper. The developed model enables an efficient assessment of unfinished projects in Vilnius, the capital of Lithuania. Unfinished building solutions, expressed through indicators, were selected and used to formulate a multicriteria task to be solved by combinations of methods AHP+ARAS, MOORA and MULTIMOORA. A computational model was created and adjusted for a simple and efficient assessment of the adequacy of investment projects in many areas of construction.

Keywords
MOORA, MULTIMOORA, construction projects, unfinished buildings, AHP, ARAS

HOW TO CITE THIS ARTICLE:

Lazauskas, M., Kutut, V., Zavadskas, E. K.: Multicriteria assessment of unfinished construction projects, GRAĐEVINAR, 67 (2015) 4, pp. 319-328, doi: https://doi.org/10.14256/JCE.1179.2014

OR:

Lazauskas, M., Kutut, V., Zavadskas, E. K. (2015). Multicriteria assessment of unfinished construction projects, GRAĐEVINAR, 67 (4), 319-328, doi: https://doi.org/10.14256/JCE.1179.2014

LICENCE:

Creative Commons License
This paper is licensed under a Creative Commons Attribution 4.0 International License.
Authors:
Lazauskas M.
Marius Lazauskas
Vilnius Gediminas Technical University
Faculty of Civil Engineering
Kutut V.
Vladislavas Kutut
Vilnius Gediminas Technical University
Faculty of Civil Engineering
Zavadskas WEB
Edmundas Kazimieras Zavadskas
Vilnius Gediminas Technical University
Faculty of Civil Engineering